Follow us :

How long is the delivery time of sintered filter material?

1. About the sintered wire mesh or sintered fiber felt


If it is the standad product, it will be about 5-7 days after receipt of payment.

If the quantity is too large, and there is not enough stock, or it is not the standard product, it will be 15-20 days according to quantity.

 

2. About the perforated sheet sintered with wire mesh or sintered powder:



It will be about 18-22 days, because it's a custom product.